TRIPOLI INTERNATIONAL AIRPORT

1.LOT DEEP FOUNDATIONS :

The foundation works on bored mud piles were carried out for the two terminals of the new Tripoli International Airport. For the East Terminal, the piles have a depth ranging from 20 to 28 m, with a diameter varying between 800 and 1200 mm. The West Terminal has similar characteristics, with piles of the same depth and diameter of 800 to 1200 mm. A total of 10 static load tests at failure were carried out, with instrumentation of the piles to ensure the conformity and strength of the foundations.

year

2009

client

JV : ODEBRECHT / TAV / CCC

location

Tripoli – Libye