SNDP FUEL TANK FOUNDATIONS IN RADES

1.Lot Bored Pile Foundations:

The deep foundation works for six fuel tanks located in the RADES oil zone in Tunisia were carried out on behalf of the SNDP company.

Three diesel tanks, each with a capacity of 8,000 m³, were built on bored piles 600 mm in diameter and 25 m deep. Two unleaded fuel tanks, each with a capacity of 6,000 m³, also rest on piles of the same dimensions and depth. Finally, a water tank, with a capacity of 3,500 m³, was founded on similar piles.

The works included pile control tests, in particular by auscultation using mechanical impedance, in order to guarantee their quality and compliance with technical specifications.

year

2017

client

SOCOBAT / SNDP

location

RADES, TUNISIE