Carousel with Smooth Circle Indicators

NEW HEADQUARTERS OF ATTIJARI BANK

1.LOT OF DEEP FOUNDATIONS & EXCAVATION ARMOURING FOR 2 BASEMENT CAR PARKS :

The work consisted of foundations on bored mud piles, with a depth of 30 m and diameters varying between 800 mm and 1000 mm. The support of the excavations for two underground car parks was carried out by lowering the water table, with the installation of slopes and berms, which were carefully studied.

year

2010

client

ATTIJARI BANK

location

Centre Urbain Nord de Tunis – Tunisie

Similar projects

Project carousel-card