Carousel with Smooth Circle Indicators

CONSTRUCTION OF A COMMERCIAL COMPLEX AND MULTI-STOREY PARKING LOT

1.LOT : DEEP FOUNDATIONS & STRUCTURES :

The deep foundation works include the construction of 102 bored piles, with diameters ranging from 800 to 1200 mm and a depth of 50 m. These piles provide a solid base for the construction of a 6-storey building. In parallel, reinforced concrete structural works will be carried out for the construction of the building, integrating elements such as foundations, columns, slabs and walls necessary to support the six-storey structure.

year

2005

client

TPS – EIFFAGE France

location

Rue A. CHRAIBI, Tunis, Tunisie