Carousel with Smooth Circle Indicators

RADES BRIDGE – LA GOULETTE

1.LOT DRILLED PILES & GEOSYNTHETIC DRAINS :

The deep foundations package for the project includes the construction of bored piles for the abutments and piers of the main bridge. The piles for the abutments are 1500 mm in diameter and 65 m deep, while the piles for the piers of the main bridge are 2000 mm in diameter and 82 m deep.

The geosynthetic drains package consists of the supply and installation of 600,000 ml of drains under the access ramps of the engineering structures, in order to ensure effective water management and prevent any accumulation of moisture around the structures.

year

2005

client

STFA : TAISEI CORPORATION

location

Tunis, Tunisie
img-5
img-6

Similar projects

Project carousel-card