NEW HEADQUARTERS OF AMI INSURANCE

1.LOT OF DEEP FOUNDATIONS & EXCAVATION ARMOURING FOR 2 BASEMENT CAR PARKS :

The works involved the construction of foundations on bored mud piles, with a total of 114 piles with a depth of 25 m. The support of the excavations for two underground car parks was carried out by the installation of recoverable sheet piles, totalling 260 linear metres of ArcelorMittal PU28 sheet piles with a length of 12 m.

year

2011

client

ASSURANCES A.M.I

location

Lac II, Tunis – Tunisie