NEW HEADQUARTERS OF THE U.S. EMBASSY IN RABAT (MOROCCO)
1.Reinforcement of excavations by Lutécienne walls in CFA piles :
The excavation reinforcement works for the construction of two car parks were carried out as follows: for the Staff-Visitor Parking, the excavation reached a depth of -11.00 m / TN, while for the Official Parking, the excavation was carried out at -9.50 m / TN. A Lutécienne wall reinforcement system was used, consisting of CFA piles with a diameter of 800 mm and a depth varying between 14 and 19 m. This system is reinforced with shotcrete with welded mesh reinforcement. The stability of the walls is ensured by Dewidag anchor rods, with two tie rods at the Staff-Visitor Parking and a single tie rod at the Official Parking.
year
2013client
SBF Maroc / BL HARBET Int.location
Rabat – Maroc