DEVELOPMENT OF THE YASMINE HAMMAMET MARINA

1.LOT TUNNEL & DEVELOPMENT OF THE MAIN ESPLANADE :

The construction work on the road tunnel under the marina includes several important stages. First, 60 cm thick diaphragm walls are installed to delimit the tunnel space. The excavation is carried out in mole, under a slab already completed, thus allowing work to be carried out under the existing structure. The construction of the tunnel structure is carried out in reinforced concrete, including the floor, the raft and the walls of the ramps.

At the same time, development work on the main esplanade of the marina is carried out, including the laying of coverings, the installation of road developments, as well as the installation of a fountain and other decorative and functional elements to improve the space.