Carousel with Smooth Circle Indicators

LIGHT METRO – EL MOUROUJ LINE

1.LOT TUNNEL :

The tunnel construction works for the passage of the Light Rail include a tunnel with a total length of 520 linear metres, divided into 385 metres in closed frame and 135 metres in open hopper in the north and south sections. The tunnel has a gauge of 4.80 metres in height and 12.00 metres in width.

The works include the following elements:

  • Earthworks required for site preparation.
  • Construction of the reinforced concrete structure of the tunnel frames and hoppers.
  • Waterproofing the tunnel slab to prevent any water infiltration.
  • Drainage works behind the closed frame sails and hoppers to ensure efficient groundwater management.

year

2008

client

SBF / TRANSTU

location

Cité El Mourouj, Tunis - TUNISIE

Similar projects

Project carousel-card